The plant, besides working continuously, allows also to work in two phases: the first is only the shredding, until the doser silo will not be filled; and the second, only of separation, using the pre-shredded material stocked in the silos. In this way also where there is a reduced electric power available can work with the plant, considering a larger capacity Silo with respect the standard model.
The final quality of the separated copper is very high and the loss of copper in the plastic is almost negligible.





